News
THE HISTORY OF PROTECH PROTOTYPE
    2012        Signed the Cooperation Agreement with Haier. Passed the annual audit of ISO 9001: 2008. 

    2011        Passed the ISO 9001: 2008. And our team expanded to over 120 members. 

    2010        Signed the Cooperation Agreement of Rapid Prototyping with Great Wall, Gree, Hisense, TCL and Changhong. Transfered the factory to Songgang with building area 3,000.00 ㎡, and equipped with 27 CNC machines. Planned the introduction of ISO 9001: 2008. 

    2008        Established cooperation partnership with Haifulong Plastics Co., Ltd, to provide us the techical support of Plastic Processing and Application. 

    2005/12   Established the cooperation partnership with Jujiang Science and Technology Co., Ltd, to be  our consultant of CNC Machining Technology. 

    2001/07   ProTech Manufacturing Limited was established in Shajing with building area 300 ㎡. 
↑last:Is the first   ↓next:THE CNC Machining OF abs Plastic

Copyright © 2023 Protech MFG LTD. rights Reserved.
ISO 9001:2015 Certitied.